Construction of Shalman Pedestrian Bridge on Imam Khomeini Street
Client: Shalman Municipality
Designer: Padir Sazeh Omran Consulting Engineers
Supervising Authority: Shalman Municipality Civil Engineering Unit
Contract number: 97-352
Start date: 2018.07.17
End date: 2018.09.11
Location: Gilan Province, Langarud County, Shalman City
Project Specifications and Overall Objective:
The goal of this project was to construct a 45-meter-long and 12-meter-wide bridge over the Shalmanrud River to establish a connection between two points in Shalman City, situated between the main boulevard and Imam Khomeini Street. The project involved the design and installation of 24 in-situ piles with a diameter of 120 centimeters and a height of 28 meters, as well as 15 precast concrete beams weighing 35 tons each. The bridge was built with these components and other related operations.