Main Talsh City Bridge Widening Project over Karganrud River

Client: Talsh Municipality

Project Designer: Padir Sazeh Omran Consulting Engineers

Project Supervision Unit: Civil Deputy of Talsh Municipality

Contract Number: 1400-12-30552

Project Start Date: 2022.09.03

Project Completion Date: 2023.06.15

Project Location: Gilan Province – Talsh County (Hashtpar)

Project Specifications and Overall Objective: 

The objective of this project is to restore the only communication route in Talsh County, in the northwest of Gilan Province, by constructing a five-span bridge in three lanes with a width of 8 meters, adjacent to the east side of the existing bridge. The project aims to build a grade-separated intersection for the main Talsh city bridge over the Karganrud River, with a length of 100 meters. The flood in 1398 (2019) had caused the complete destruction of the existing bridge’s return lane, so a new bridge was designed and constructed with special precautions and considered a high-priority structure. The project was executed on a 3,000-square-meter plot with five intermediate piers built on the Karganrud River bed, with a span length of over 100 meters adjacent to the existing bridge. It also involved constructing a cut-off in the river bed to prevent scouring of the existing bridge foundations, using in-situ casing. The newly constructed bridge includes the following components:

– Construction of a five-span concrete bridge with a width of approximately 8 meters, a length of 100 meters, and a deck area of 800 square meters

– Pile installation operations for the project, including 32 in-situ piles with a diameter of 120 centimeters and a height of 28 meters from the ground level

– Concrete pouring volume for the project: 3,000 cubic meters of concrete

– Formwork volume for the project: 2,200 square meters, along with slab edge formwork

– Rebar used in the project: 560,000 kilograms

– Soil operations volume for the project, including excavation and backfilling: 9,000 cubic meters

Construction of a Bridge Adjacent to Fire Station No. 2 in Nakhejir Kalayeh, Lahijan
Golsar Pastak Bridge Widening Project in Rasht City